True mate, I just hate the long days with same day makes the day really heavy. I prefer next days but dont want to be scratching concrete. I've got some wickes accelerator I'll bang that in. How many litres to a drum does anyone know? I've got 4 days sprayingT50 is on the earthy colours isn't it, so it's dark when it's sprayed on. It will absorb sunlight so set quicker than a lighter colour if it's on a panel that gets the sun.
Put some accelerator in it, get it on earlier, get it done in the day. More profitable to get done in the day than drag over 2.