On a job where wall are partly underground and got bad water penetration looking for a slurry brush on tanking system but need to scratch and finial render coat it quickly any ideas guys cheers Rob.
 
On a job where wall are partly underground and got bad water penetration looking for a slurry brush on tanking system but need to scratch and finial render coat it quickly any ideas guys cheers Rob.

It takes as long as it takes mate, don't rush it follow the spec. :RpS_thumbup:
 
used it a long time back and rendered over it but its a distant memory, click the link and you will see if its for you or not, good luck
 
When rendering over tanking, remember the is no suction what so ever. Just put it on scratch it up and leave. Top it out the next day. If you start messing it'll slide on the floor.

If you get it on in one coat it can take 6-8 hours to be ready to devil float.

So as said it'll take as long as it takes.
 
When rendering over tanking, remember the is no suction what so ever. Just put it on scratch it up and leave. Top it out the next day. If you start messing it'll slide on the floor.

If you get it on in one coat it can take 6-8 hours to be ready to devil float.

So as said it'll take as long as it takes.

wtf is a devil float... Whatever if us I wanna get me one of these ;-)
 
a Devil float is well, a devil float really.

the one you use for floating up backing plasters with the nails sticking through the end
 
done loads with heidi k11 system, depends on the substrate but generally (after it's beencleaned down/prepped) a wash down with water and sbr at9 to 1 then a modified renderscratch coat but dont scratch it just smooth over, next day two coats of slurry in opposite directions of application , whilst still tacky apply scratch coat of modified render(sand /cement using a gauging mix of 4parts water and 1 sbr) and float up with the devil float allow 24 hours then float up with modified render mix , simples , never fails
 
If your after a guaranteed system , just get a spec off the product manufacturer and follow that , sov chenmicals will measure the job up for you give you a qaunts and spec followed by a gaurante
 
If your after a guaranteed system , just get a spec off the product manufacturer and follow that , sov chenmicals will measure the job up for you give you a qaunts and spec followed by a gaurante

Thats who I use Soverign only got introduced last year but very good products plus service :RpS_thumbsup:
 