That's the meaning of life right there.
Merry Christmas to you and all your family.

just been sent to bed :crying:
gotta skim start this tomorrow 4 miserable days.
In the lake district
she wants me sober to drive :rayos:
 

Attachments

  • Screenshot_20191220-155243_Samsung Internet.jpg
    Screenshot_20191220-155243_Samsung Internet.jpg
    867.8 KB · Views: 184
  • Screenshot_20191220-155320_Messages.jpg
    Screenshot_20191220-155320_Messages.jpg
    450.9 KB · Views: 197
just been sent to bed :crying:
gotta skim start this tomorrow 4 miserable days.
In the lake district
she wants me sober to drive :rayos:
I work that out to be roughly 38 bags of multi, 4 days.... You're a f**k**g animal
 
Do you one coat as well Rob? That metreage would take me just over fifty bags, more if there's tapered edge being used.
Having said that I never work off meterage. I usually work it out on how many boards there are. In this case it's 178 boards. So you're saying a bag of multi does around 3.5 boards. I'd say it's more like 4.5 hence the 40 bags.
I have a backwards way of working it out though lol
 
Yes about 3.5 8x4 boards, = 10m2
Depending on the amount of beads and doorframes on studwork to work around, plus a bit of waste, I'll work on 8m2 per bag when supplying. Rarely far out.
Either way, f**k that in 4 days. I'd allow 3 weeks labour lol. If I get it done in 2 then it's a bonus
 
Either way, f**k that in 4 days. I'd allow 3 weeks labour lol. If I get it done in 2 then it's a bonus
When I was younger and fitter I would have skimmed that in 6-7 days. Chris is an animal and shouldn't be used as the standard by which others are judged. A bit like saying Linford Christie was a slow runner, because of what Usain Bolt could do.
 