Im looking for some advice guys.
I am doing a job tomorrow that involves some rendering, the customer has also asked me to stick on 4 plaster moulds onto a set of gate pillars that have been rendered in the last few weeks. I have never done this before and was wondering what is the best way to do this. Do I use gripfill or something similar. Thanks
I am doing a job tomorrow that involves some rendering, the customer has also asked me to stick on 4 plaster moulds onto a set of gate pillars that have been rendered in the last few weeks. I have never done this before and was wondering what is the best way to do this. Do I use gripfill or something similar. Thanks