Set up the G4 to spray a gable on thursday using mains water. Connected up and got a reading of 3 bar pressure which was great and started spraying at around 260 on the flow bottle.
Mid gable and the material starts to get pissy so climbs of the scaff checks the bottle and the reading is now up to 500.
The machine did this a couple of times during the spray so any ideas fellas?
Mid gable and the material starts to get pissy so climbs of the scaff checks the bottle and the reading is now up to 500.
The machine did this a couple of times during the spray so any ideas fellas?