Ok, I will be floor-mounting my new G70. The problem is, the floor in my theater is concrete and I don't have the ceiling height to construct a raised floor.
So that I can hide the cables, I want to run PVC tubing on the concrete floor.
So... How do I go about cutting a 12' long 3" wide 3" deep channel in the concrete floor? Is there any way I can accomplish this
without using a water-cooled diamond-tipped blade? Once I get the channel cut and pvc installed, what type of cement should I
use to fill in the gaps?
So that I can hide the cables, I want to run PVC tubing on the concrete floor.
So... How do I go about cutting a 12' long 3" wide 3" deep channel in the concrete floor? Is there any way I can accomplish this
without using a water-cooled diamond-tipped blade? Once I get the channel cut and pvc installed, what type of cement should I
use to fill in the gaps?