Come on Post up your jobs at home during lockdown

Vincey

Private Member
Just finished tiling the cuts I left for about a year as knew it would tax my brain but all done mrs is chuffed to be getting jobs finished around house
What you lot got done ?
D8DCF61C-0789-4F60-8156-B149C809DFC8.jpeg
 
Added new sockets, skimmed and mist coated one of the bedrooms. Trying to build up the enthusiasm to rub down the wood work
 

Attachments

  • 08653093-7C4C-4A96-BE29-333087F19183.jpeg
    08653093-7C4C-4A96-BE29-333087F19183.jpeg
    1.1 MB · Views: 217
  • 9D26CA32-3542-491E-AA88-2EF2DC2DB688.jpeg
    9D26CA32-3542-491E-AA88-2EF2DC2DB688.jpeg
    593 KB · Views: 183
  • 55EA5BAD-2725-49D4-B26F-691277820A2D.jpeg
    55EA5BAD-2725-49D4-B26F-691277820A2D.jpeg
    586.8 KB · Views: 193
  • 8A689447-5DC6-4DBA-9775-BDA7A8B9B57C.jpeg
    8A689447-5DC6-4DBA-9775-BDA7A8B9B57C.jpeg
    741.9 KB · Views: 177
Last edited:
Doing some brickwork in the garden at the moment 9 inch grinder has blown up
T
Swmbo has ordered paint , tiles and goodness what else to get the house finished while I’m off as I never get the time to get my own place done.
I’m glad really as I’ve never been the one to sit around
 
I've got the extension/refurb thing to finish. I'm starting with the remaining electrics. At some point I've got to fit out the plastered in channels in the bedroom, but that may have to wait a bit until I get the big ladders over. The one at the top of the vaulted part is 3.5m from the floor. Maybe do the flooring next week with some finishing bits in the kitchen.

May get up to the unit at some point and see about recommissioning the bike as it hasn't run for 2 years.
 
Top