scott.beaumont
New Member
Have 180m2 ceiling over a school swimming pool to do. The contractor specified aquapanel cement boards and knauf have supplied there tape, to be applied with joint filler then there primer then this interior skim that comes already knocked up in bags. Anyone used this before what's it like? It says put a coat on 1-1.5mm leave 12-24 hours apply another coat then leave to dry and sand. Sounds like joint cement to me. They want the ceiling fully skimmed so tape and jointing wasn't a option.
Thanks.