Just recently plastered a living room ceiling 7mby4m it originally had a dividing archway that was removed.
Anyway i plasterboard the archway gap. Taped the joints, pva the original plaster. 2 coat skim full ceiling. (had no heating as rads were dropped).
3 weeks later radiators back on and a airline crack has appeared were the arch was. Do you think its heat and movement?
Anyway i plasterboard the archway gap. Taped the joints, pva the original plaster. 2 coat skim full ceiling. (had no heating as rads were dropped).
3 weeks later radiators back on and a airline crack has appeared were the arch was. Do you think its heat and movement?