DominoRemoved
New Member
hi lads how much gear will i need for a 10m2 s/c with lime ???
im thinking about a tone of sand 6 cement and maybe 2 lime at a push water proofer and feb iv got in the lock up
im thinking about a tone of sand 6 cement and maybe 2 lime at a push water proofer and feb iv got in the lock up