100 mtrs a Day

Who can ?

  • yes but only 1 out of 5 days

    Votes: 0 0.0%
  • yes but only 2 out of 5 days

    Votes: 0 0.0%
  • yes ,but only 3 0ut of 5

    Votes: 0 0.0%
  • yes but only 4 out of 5

    Votes: 0 0.0%
  • Don't kneed to i got employees

    Votes: 0 0.0%
  • no problem

    Votes: 0 0.0%

  • Total voters
    0
Status
Not open for further replies.
we are talking site work you need a method like simps said with mp75 its not hard our lab beads up and tapes in front of us so we do no prep
 
the right job it can be done we had a job started last year in central london working on the cores of the building in two hits we were doing 180m
 
most i've done is 3 ceilings at 5m x 5m so thats 75m2! started at 8 and was finished at 3. one was overskim with thistle bond it and the other 2 were boarded and scrimmed the day before. I could easy done another and worked til 5! only had one break for ten minutes though for dinner!
 
i dont have brakes, im all domestic but id say we prep and skim an 5x5 room a day if it there 2 be done
 
if i seen you grafting grand i would buy you a nice dark coffee with 3 sugars and a rocky buscuit.
i reckon you would stop for 5mins then
 
I did a flat on site and one day I got 100Msq on (hand applied) it happened. it never happened before and it wont be happening again!
(This includes ceilings by the way just walls dont count, most can hit that on a good run of walls)
 
Grand i used to work like that but trust me mate keep it up and all it will do is wear your body out till you can work no more or worse an early grave, ive seen to many go to young with the lifestyle of hard work combined with to much drink, with a lot of people it goes hand in hand. Not saying you drink to much Grand cos i dont know.
Lucius
 
bloke in the gang i used to work in was bout 26. we were doing a house and he had 6 bags of skim on, on several walls and a lid, and was sitting on his crate waiting for it to go off. he was proper quick
 
how
nick0412 said:
bloke in the gang i used to work in was bout 26. we were doing a house and he had 6 bags of skim on, on several walls and a lid, and was sitting on his crate waiting for it to go off. he was proper quick
how many arms did he have
 
wouldnt be a suprise, a few years ago workin the sites of manchester alot of the lads on our jobs on pricework used all sorts of pick me ups to bang out the measure through the day! worrying really its come to that, Wonder what the unions wouldv done about it? rate rise perhaps? nah sweet FA.
 
nick0412 said:
bloke in the gang i used to work in was bout 26. we were doing a house and he had 6 bags of skim on, on several walls and a lid, and was sitting on his crate waiting for it to go off. he was proper quick

ah that was years ago, i cant do it anymore....................... they wont let me bring the crate on site :)
 
Status
Not open for further replies.
Back
Top