Search results

  1. C

    Too wet or too dry - not enough suction?

    Newbie Mess going on here in Aus. I'm sand cement base coat onto newish bricks. I cleaned then sealed with our uni-bond (Bondcrete) at a fairly weak mix (say 1: 6 or 7) then after that dried I applied a stronger PVA coat around 1:2 or 3 and let that get dryish, it didn't seem to be tacky though...
  2. C

    Best adhesion?

    Hi all, Looking for some good advice, I have to plaster up some fairly rough bricks with a good sand cement base in a new shower area to then take an applied Crommelins waterproofing layer prior to tiling. In places this base will need to be a good depth.... say around 20mm or more. I want to...
  3. C

    What have I done wrong here????

    Hi All, I'm in Western Australia; There was a pine timber ceiling with exposed rafters every 1200 (4ft) with corrugated tin roof over that. There were small timber collar ties at the height of the stainless tension wires I've replaced them with and the pine ceiling was fixed to the 50mm collar...
Top