There is a few fixing in each board so boards going no where.
I couldn't stud wall as involved moving door ways and pipe work.and customer didn't want this. It's only 3 boards do might start again cheers for input.
All taking in thanks
I foamed the cellotex to plasterboard then stuck with adhesive. I thought the cellotex would act as a vapour barrier as its foil back. All other rooms are fine just this one spot.
Don't understand why. Next room I will try your method thanks.
Hi, I've recently done a job where there was damp patches on the external walls. I hacked back the old lime plaster left 7 days to dry out.
Then applied a strong water proof scratch coat to walls. Followed by 25 mm cellotex then dot and dab moisture board. Then a skim.
2 weeks later there is a...
Hi, I've recently done a job where there was damp patches on the external walls. I hacked back the old lime plaster left 7 days to dry out.
Then applied a strong water proof scratch coat to walls. Followed by 25 mm cellotex then dot and dab moisture board. Then a skim.
2 weeks later there is a...
Hi gotta a job to price up.
It's a solid old concrete bunker that needs insulating re boarding and skim
Was thinking of 3 options
Cellotex batten plasterboard
Thermo plasterboard (dot and dab)
Or this bubble wrap insulation batten board etc
Any advice??