Intro from new member

Members online

james toney

New Member
Hello all, I am building a 6x6M2 timber framed extension. 150mm celotex between 150mm studs, the studs are sandwiched between OSB and cemboard and have wrapped the final layer in EWI system, 90mm rock wool. base coat and mesh, the finish coat is 3mm grained silicone. It has warm deck GRP roof that is ridged all round, internal drainage and minimum overhang, no soffit.
 
Hello all, I am building a 6x6M2 timber framed extension. 150mm celotex between 150mm studs, the studs are sandwiched between OSB and cemboard and have wrapped the final layer in EWI system, 90mm rock wool. base coat and mesh, the finish coat is 3mm grained silicone. It has warm deck GRP roof that is ridged all round, internal drainage and minimum overhang, no soffit.
Are you doing all the work yourself?
 
Good to know what the retired pro boxers are up to these days, certainly sounds more successful than your UFC career. thanks for keeping everyone in the loop.
 
Top