Wickes Accelerator

Members online

I use an industrial wheelie bin. I reckon in April 3 tubs for Monorex.

Did a patch yesterday alarm box size 15mm deep on micro. So being a solid wall house I put a dash of retarder in being 1pm.

Went back this morning 7 am still wet. Went back at 5pm wet but stiffening up. Going to try again tomorrow morning. Maybe 43 hours later.
 
I tried getting some axel 3000 today.
Anyone know if I can get some delivered by Tuesday morning or am I trying my luck!


Sent from my iPhone using Tapatalk
 
We've had an overnight frost every night this week, and 2 inch of snow on Wednesday, and it got to a barmy 7c today. 1st may Sunday :nocausagracia:
 
Getting warmer next week in the south !
Yup your right :descansando:
image.png
 
Got pinched by a mobile speed camera two weeks ago doing a favour. t**t did from 228m away and 10m from a NTional Speed limit sign.

So no, not keen on driving in unknown terrortory at the moment.

Got a great app now though. Cyclops £2.99 a year.
 
Thanks John but thats about 10mins more than I'd travel [emoji14] thanks for the offer though, may God bless you with invincibility next time you travel [emoji106][emoji106][emoji106]


Sent from my iPhone using Tapatalk
 
Wakefield any good? I will go to a Rhubarb farm neraby and get a some to freeze for my porridge.

Where are you I owe Scrogs in Bradford a visit if he is at home.
 
Yea I'm always going over a base coat of monogris or parinter.
I've tried 2 tubs of wickes and also 2 tubs of ever build that's why I wanted to try the Parex one, thought it may of been a bit stronger so less needed but still worth the Extra cost.
We're finishing spraying at 11 latest and not finishing scraping till 6.30ish. Weird thing is done a 20m and a 45m the other day and we finished at the same time! Maybe I'm being over expectant as it is Parex but maybe an extra hour less would be great!


Sent from my iPhone using Tapatalk
 
My tub is about 320 ltrs and I have put 3 Wickes in before to Kilsaren. Kilsaren is as slow as Parex.

Put 2 in, in summer for a 5pm finish.

I dont rate the Axel that much. I prefer the stuff I get shipped in. But use Axel in Parex.
 
My tub is about 320 ltrs and I have put 3 Wickes in before to Kilsaren. Kilsaren is as slow as Parex.

Put 2 in, in summer for a 5pm finish.

I dont rate the Axel that much. I prefer the stuff I get shipped in. But use Axel in Parex.
Whats the stuff you get shipped in John? and whats the prices?
cheers.
 
Yea I'm always going over a base coat of monogris or parinter.
I've tried 2 tubs of wickes and also 2 tubs of ever build that's why I wanted to try the Parex one, thought it may of been a bit stronger so less needed but still worth the Extra cost.
We're finishing spraying at 11 latest and not finishing scraping till 6.30ish. Weird thing is done a 20m and a 45m the other day and we finished at the same time! Maybe I'm being over expectant as it is Parex but maybe an extra hour less would be great!


Sent from my iPhone using Tapatalk
I think with parex this time of year you need to get it On for 9-9.30 for a 5-6 finish mate
I used 5 tubs in a large water butt the other day with prorend at 18mm with the sun on it and was ready by 3pm!!!
It's gonna be warmer next week by the looks of it
 
Been using 3.5 last few week on weber was ok to rub at 2/3 ish but has been cold,dont think it was any quicker than what your getting with 2.

How many litres is your butt? Have you ever stuck anything else in it?
 
Top