Extra time additive

Members online

savory05

New Member
Hello peeps just thought I’d post about extra time additive on a BIG ceiling we did 9 bagga and it worked good for us do as it says on packet then half amount for each bag for the next gauge laying in pictures before and after will use again thanks mark at extra time for info And the last room we did as well main offices
 

Attachments

  • A33969DE-05DB-441E-B8F0-5CA8FDC89D27.jpeg
    A33969DE-05DB-441E-B8F0-5CA8FDC89D27.jpeg
    527.1 KB · Views: 354
  • 62EA4EF3-5597-4017-967E-2FCF5B7A142E.jpeg
    62EA4EF3-5597-4017-967E-2FCF5B7A142E.jpeg
    482.4 KB · Views: 349
  • EFA8DECB-D405-4F52-BD8F-432A36AF9F4E.jpeg
    EFA8DECB-D405-4F52-BD8F-432A36AF9F4E.jpeg
    2.4 MB · Views: 312
  • 7D18DF95-1497-470D-8346-1ABED38B2797.jpeg
    7D18DF95-1497-470D-8346-1ABED38B2797.jpeg
    1.1 MB · Views: 302
  • 54B3F841-D304-434D-BA95-109A7F6B7D28.jpeg
    54B3F841-D304-434D-BA95-109A7F6B7D28.jpeg
    2.6 MB · Views: 312
  • DD731F79-352F-4D1D-87BB-78C9F8F45E0E.jpeg
    DD731F79-352F-4D1D-87BB-78C9F8F45E0E.jpeg
    1.3 MB · Views: 279
  • E7928544-AE13-419D-994D-B279C3E47CA3.jpeg
    E7928544-AE13-419D-994D-B279C3E47CA3.jpeg
    1 MB · Views: 264
  • 671ADFAB-A9D7-4028-8D86-D64739EE29F6.jpeg
    671ADFAB-A9D7-4028-8D86-D64739EE29F6.jpeg
    2.2 MB · Views: 267
  • 5D09AE16-1B86-4C5F-BC7D-CBC6EBFDC131.jpeg
    5D09AE16-1B86-4C5F-BC7D-CBC6EBFDC131.jpeg
    672.4 KB · Views: 277
  • A2CD094D-AA5F-4140-B4E8-2FB50FE53232.jpeg
    A2CD094D-AA5F-4140-B4E8-2FB50FE53232.jpeg
    2.3 MB · Views: 384
Hello peeps just thought I’d post about extra time additive on a BIG ceiling we did 9 bagga and it worked good for us do as it says on packet then half amount for each bag for the next gauge laying in pictures before and after will use again thanks mark at extra time for info And the last room we did as well main offices
Very nice done some big stuff in my time but nothing as big as that
 
picture 1 is 1 day skimming
picture 5 I think is 3 days because of sky lights

:birra:
Ye ur right there but we had to over board it 1st, day & half t do was a biatch as it was a false ceiling b4 so the boards was just tacked up to stop debris falling on ceiling etc then skim the mofo
 
Top