One coat

Don’t need to coats in this weather it’s warm enough. Maybe winter if the second coat will fit over the first coat. I recommend I size up on the second coat.
 
Blatenly a controversial thread to get us all going but ok I’ll bite. It takes me longer to do 1 coat than it does 2.
 
I one coated a boarded bathroom the other day set took 2.10...builder I worked for painted it other day and said it looks pucker...made me think
 

Attachments

  • ED35067D-42B7-4BF9-9D21-D4E30C8EA167.jpeg
    ED35067D-42B7-4BF9-9D21-D4E30C8EA167.jpeg
    76.2 KB · Views: 223
No , gear is fine that just the trowel going from one set to another and obviously the first one will be slightly drier especially next to the corner, but I couldn’t care less, it dries good and one colour.
 
Top