The Half Time Bucket Test

Oh that is magic.........that's gonna make that little 100m2 ceiling we all bosh in on the day before xmas eve.......a piece of piss........
Knock up, bash it on, home for a late brekky.........

This time next year rodders......
 
That's more like it, as long as it doesn't alter the product of course


Sent from my iPhone using Tapatalk
Used a few over different surfaces just small mixes had no problems, uniform pink when dried out no patchy areas, tbh i loved it
 
Why are plasterers obsessed with speed and always in a rush? . Plaster sets quick enough for me as it is.
 
I am really looking forward to his unbiased opinion :popcorn:
Does dry fast mate :sorprendido3:

IMG_4580.JPG


Honest as usual
 
Meanwhile here on the costa it's gridlocked I'd say this happens in either direction at least 5times a day.
I would put Spanish driving on a par with the Italians and only slightly better than the Maltese who are truly horrific.
IMG_6584.JPG
has been blocked for over an hour and even police and fire crews barely audible over the orchestra of horns From said eejits in cars.:cachetada:
P.s. Yes it's cloudy :hola:
 
That stuff looks ok, but to be fair if I need something to go off quicker I just use some of my dirty water from my cleaning bucket, that sets stuff in about 30mins tops! Oh and it's free!!
 
But with dirty water u don't know how long u have it's inconsistent
Yeah true, I know what you mean and the stuff does look good, but If your after a quicker setting time on small areas then timing surely is not a worry?
 
3 quid a sachet mate! and you need 2 to every 25kg bag of gear. That's £6 on top of every bag of plaster. :inocente:

f**k that. Sure that's a load of b*ll***s. He made a big massive mistake on his pricing that's f**k**g ridiculous. £2 a pack that would do a 25kg bag would be more like it.
 
I'll not be using it so. It's a pity. I was hoping to use it most days when skimming to be honest
At them prices it's gotta be £30 a day spent on it so that's £150 a week f*ck that!!!! I'll just stick to adding my dirty water to the mix when needed! (Tried and tested method.) Lol.
 
On the bags I've used it in I found one bag with one sachet of half time set and finishes at 50-70 minutes when it's been on board work it's consistently been set and finished at 60 minutes if that helps.
They were 2 coats with same gear
 
On the bags I've used it in I found one bag with one sachet of half time set and finishes at 50-70 minutes when it's been on board work it's consistently been set and finished at 60 minutes if that helps.
They were 2 coats with same gear

So I wonder if I use 1 pack to a bag and one coat skim will I get it down to a hour set. Still think it should be only £2 to a 25kg bag tho
 
Top